The
spigot mortar was loaded by 'breaking' the rear of the barral
downwards allowing the projectile to be inserted from below.
The usual two piece co-driver's hatch was plated over and a
sliding hatch to allow access to the mortar. Note that the turrt
would have to be rotated slighly to the left for this operation
to be perfomed.